title: Preparation for L230 / L235 Ceiling Version
description: This article explains what to do before starting the installation of the ceiling version.
---

[Skip to content](https://docs.metrilus.com/en/preparation-for-l230/l235-ceiling#main-content)

- [English](https://docs.metrilus.com/en/preparation-for-l230/l235-ceiling)
- [Deutsch](https://docs.metrilus.com/de/vorbereitung-für-l230/l235-ceiling-version)

English

Show submenu for translations

[![metrixfreight\_transp\_0525](https://docs.metrilus.com/hubfs/metrixfreight_transp_0525.svg)](https://docs.metrilus.com/)

Open main navigation

Close main navigation

- - [English](https://docs.metrilus.com/en/preparation-for-l230/l235-ceiling)
    - [Deutsch](https://docs.metrilus.com/de/vorbereitung-für-l230/l235-ceiling-version)

  English
  
  Show submenu for translations
- [metrilus.com](https://metrilus.com/)

[metrilus.com](https://metrilus.com/)

 How can we help you?

- There are no suggestions because the search field is empty.

1. [MetriXFreight Documentation](https://docs.metrilus.com/en)
2. [Installation L-Series](https://docs.metrilus.com/en/installation-l-series)
3. [Installation Preparation](https://docs.metrilus.com/en/installation-l-series#installation-preparation)

June 7, 2024

# Preparation for L230 / L235 Ceiling Version

## This article explains what to do before starting the installation of the ceiling version.

Read the article about [general preparations beforehand](https://docs.metrilus.de/en/general-preparations)

Metrilus does not provide recommendations, but rather examples. Metrilus does not conduct on-site inspections and is not familiar with the structural integrity of the warehouse.  
Therefore, it is the responsibility of the customer to choose the appropriate fixation after assessing the on-site conditions. Metrilus does not assume any liability for the proper installation of the fixation.

### How to position the system and the scale

light grey: ceiling system

green: scale

dark grey: ram protection

![ceiling top diagramm](https://portal.metrilus.de/hubfs/ceiling%20top%20diagramm.png)

#### There are two options available for attaching the system to the ceiling.

- Mount to building
- Mount to existing warehouse equipment

The customer (and contractor) are responsible to use a suspension solution that takes all of the building information (from the architect, engineering bureau) and load bearing capacity into consideration.

### What is a good ceiling suspension?

- No swinging or swaying back and forth
- Does not rotate around its own axis, see diagramm below for suggestions
- Appropriate Height of approximately 3.6 to 4.0 meters
- Truss is parallel to the floor

### Dimensions of the System

![L23x-C-iso](https://portal.metrilus.de/hubfs/L23x-C-iso.png)

 

### Examples of Ceiling Installations

![](https://portal.metrilus.de/hubfs/image-png-Dec-04-2023-12-42-45-2728-PM.png)

![](https://portal.metrilus.de/hubfs/image-png-Dec-04-2023-12-43-34-0300-PM.png)  ![](https://portal.metrilus.de/hubfs/image-png-Dec-04-2023-12-43-45-5252-PM.png)

 

 

![image-png-Dec-04-2023-10-03-18-5946-AM](https://portal.metrilus.de/hubfs/image-png-Dec-04-2023-10-03-18-5946-AM.png)

 

![](https://portal.metrilus.de/hubfs/image-png-May-28-2024-11-58-04-0478-AM.png)

 

- [Product overview](https://docs.metrilus.com/en/product-overview#main-content)

    - [MetriXFreight Products](https://docs.metrilus.com/en/product-overview#metrixfreight-products)
    - [Hardware Add-ons](https://docs.metrilus.com/en/product-overview#hardware-add-ons)
    - [Documents](https://docs.metrilus.com/en/product-overview#documents)
- [Installation L-Series](https://docs.metrilus.com/en/installation-l-series#main-content)

    - [Installation Preparation](https://docs.metrilus.com/en/installation-l-series#installation-preparation)
    - [Installation](https://docs.metrilus.com/en/installation-l-series#installation)
- [Installation S-Series](https://docs.metrilus.com/en/installation-s-series)
- [3rd Party Hardware](https://docs.metrilus.com/en/3rd-party-hardware#main-content)

    - [Barcode Scanner](https://docs.metrilus.com/en/3rd-party-hardware#barcode-scanner)
    - [Scales](https://docs.metrilus.com/en/3rd-party-hardware#scales)
- [Troubleshooting](https://docs.metrilus.com/en/troubleshooting)
- [Operational integration](https://docs.metrilus.com/en/operational-integration#main-content)

    - [IT Integration](https://docs.metrilus.com/en/operational-integration#it-integration)
    - [Workflow](https://docs.metrilus.com/en/operational-integration#workflow)
- [Ongoing operation](https://docs.metrilus.com/en/ongoing-operation#main-content)

    - [Calibration](https://docs.metrilus.com/en/ongoing-operation#calibration)
- [Best practice](https://docs.metrilus.com/en/best-practice)

[![metrilus\_white\_0525](https://docs.metrilus.com/hs-fs/hubfs/metrilus_white_0525.png?width=102&height=30&name=metrilus_white_0525.png "metrilus_white_0525")](https://metrilus.com)

 

<https://www.linkedin.com/showcase/metrixfreight/> <https://youtube.com/metrilus>

Copyright © 2025 | metrilus GmbH | [Impressum](https://metrilus.com/de/impressum)